The EX2600 availability was being interrupted between scheduled maintenance intervals due to high wear rates for the lip wear package.
The EX2600 availability was being interrupted between scheduled maintenance intervals due to high wear rates for the lip wear package.
Goldmont designed and fitted a wear package that allowed the EX2600 to dig uninterrupted between scheduled maintenance intervals.
This resulted in target production levels being continually exceeded and lower maintenance cost.